Getting to Utah’s capital city will be even faster, easier and sleeker with the opening of the first phase of the new Salt Lake City International Airport (SLC) in September, the first new hub airport to be built in the United States in the 21st century. The $3.6 billion project has two phases, with the South Concourse opening in 2020 and the North Concourse set to launch in 2024. The expansive, light-filled terminal will offer dramatic views of the towering Wasatch Mountains, great food and cutting-edge retail, making the airport an extension of the overall Salt Lake and Utah experience. Plus, the new Utah Transit Authority TRAX station at the South Concourse terminal will make it easy to travel into downtown Salt Lake. 

Highline, a 116-room modern mountain resort, opened its doors in west Vail just in time for the 2019/2020 ski season. An elevated cabin-in-the woods aesthetic flows throughout the property, from the A-frame communal lobby and restaurant to cozy guest rooms and spacious loft suites. The interior features weathered woods, slate and leather accents in a palette of soothing neutrals and region- ally inspired art and fixtures.

 

With more than $10 million in improved and updated event, conference and wedding facilities, Taos Ski Valley now offers nearly 50,000 square feet of indoor and outdoor event space.

 

Hyatt Regency Lake Tahoe Resort, Spa and Casino in Incline Village has completed a $1 million renovation of two signature meeting and event venues. Lakeside Ballroom with panoramic views of North Lake Tahoe now features floor-to-ceiling windows and large sliding doors that open directly to the Lakeside Patio. The ballroom also was outfitted with new carpet and paint, dark wood wall accents and a redesigned ceiling with warm-toned chandeliers.